Wuxi Flyt New Energy Technology Co.,Ltd.

page_banner

F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our business puts emphasis over the administration, the introduction of talented staff, plus the construction of employees building, striving hard to boost the standard and liability consciousness of staff members. Our corporation successfully attained IS9001 Certification and European CE Certification of Low Wind Generator, Mini Wind Turbine Generator, Wind Generator 2kw, our merchandise have superior popularity from the whole world as its most competive cost and our most advantage of after-sale assistance for the clients。
F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt Detail:

Features

1.Low start up speed, 6 blades ,high wind energy utilization
2.Easy installation, tube or flange connection optional
3.Blades using new art of precision injection molding,matched with optimized aerodynamic shape and structure,which enhance the wind energy utilization and annual output.
4.Body of casting aluminum alloy, with 2 bearings swivel , making it survive stronger wind and run more safely
5.Patented permanent magnet ac generator with special stator,effectively reduce torque,well match the wind wheel and generator, and ensure the performance of whole system.
6.Controller,inverter can be matched accroding to customers’ specific needs

Package list:
1.wind turbine 1 set(hub,tail,3/5 blades,generator,hood,bolts and nuts).
2.wind controller 1 piece.
3. installation tool 1 set.
4.flange 1 piece.

Specifications

Model F-S3-100 F-S3-200 F-S3-300 F-S3-400
Rated Power(w) 100w 200w 300w 400w
Max Power(w) 110w 210w 310w 410w
Rated Voltage(v) 12/24V 12/24V 12/24V 12/24/48V
Blades length(mm) 550 550 580 630
Top net weight(kg) 7 7 7.5 7.5
Wind wheel diameter(m) 1.2 1.2 1.25 1.3
Rated wind speed(m/s) 13m/s
Start-up wind speed 2.0m/s
Survival wind speed 50m/s
generator 3 phase permanent magnet synchronous generator
Service Life More Than 20 years
Bearing HRB or for your order
Blades material nylon
Shell Material aluminium alloy
Permanent Magnet Material Rare Earth NdFeB
Control system Electromagnet
Lubrication Lubrication Grease
Working temperature -40 to 80

Assembly Requirements

1. Before the assembly of the wind generator or in the process of maintenance, please be sure to read the users manual first..

2. Please don’t install the wind turbines in rainy days or when the wind scale is at Level 3 or above.

3. After opening the package, it is advised to short circuit the three leads of the wind turbines (the exposed copper parts should be screwed together).

4. Before the installation of the wind turbine, lightning grounding must be prepared. You can arrange the facilities according to national standards, or you may arrange them according to the local environment and soil condition.

5.When assembling the Wind turbine, All the parts should be fastened with fasteners specified in table1.

5.When assembling the Wind turbine, All the parts should be fastened with fasteners specified in table2

6. Before the connection between the wind turbine flange and the tower flange, please connect the three leads of the wind turbine to the three leads of the tower accordingly. When using the hinge method, every pair of wires should be no less than 30mm in length and be wrapped with Acetate cloth tape for three layers, then sheathed with spun glass paint tube. With this method, connect the three pairs of wires (attention: the joint of the wires can’t bear the weight of the tower leads directly, so wires 100mm downward from the joint should be wrapped with adhesive tape and then stuffed into the steel pipe. After that, wind turbine flange and tower flange can be connected.

7.Before hoisting the wind turbines, the end (which should be connected with controller)of the tower lead should be cut away the insulating layer for 10mm or so. Then screw the three exposed leads (shot circuit) together.

8. During the installation, it is prohibited to revolve the rotor blades roughly (the ends of wind turbine leads or the tower leads are short-circuited at this moment). Only after all the installation and the examination is finished and the security of the erection crew is guaranteed, it is allowed to dismantle short circuited leads and then connect with controller and battery before  running.


Product detail pictures:

F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt detail pictures

F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt detail pictures

F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt detail pictures

F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt detail pictures

F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt detail pictures

F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt detail pictures


Related Product Guide:

Our business has been focusing on brand strategy. Customers' pleasure is our best advertising. We also offer OEM company for F-S3-300 300w low speed permanent magnet generator home wind turbine generator magnet free energy – Flyt, The product will supply to all over the world, such as: Oman, Slovenia, Iraq, Our products are very popular in the word, like South American, Africa, Asia and so on. Companies to "create first-class products" as the goal, and strive to deliver customers with high quality solutions, present high-quality after-sales service and technical support, and customer mutual benefit, create a better career and future!
  • The product classification is very detailed that can be very accurate to meet our demand, a professional wholesaler.
    5 Stars By Matthew from Malaysia - 2018.09.29 17:23
    It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Frank from Bogota - 2017.02.28 14:19