Wuxi Flyt New Energy Technology Co.,Ltd.

page_banner

S2 200w 300w 12v 24v 48v Horizontal Wind Turbine Generator

Short Description:

1.Low start up speed, 6 blades ,high wind energy utilization
2.Easy installation, tube or flange connection optional
3.Blades using new art of precision injection molding,matched with optimized aerodynamic shape and structure,which enhance the wind energy utilization and annual output.
4.Body of casting aluminum alloy, with 2 bearings swivel , making it survive stronger wind and run more safely
5.Patented permanent magnet ac generator with special stator,effectively reduce torque,well match the wind wheel and generator, and ensure the performance of whole system.
6.Controller,inverter can be matched accroding to customers’ specific needs


  • :
  • Product Detail

    Product Tags

    Video

    Features

    1.Low start up speed, 6 blades ,high wind energy utilization
    2.Easy installation, tube or flange connection optional
    3.Blades using new art of precision injection molding,matched with optimized aerodynamic shape and structure,which enhance the wind energy utilization and annual output.
    4.Body of casting aluminum alloy, with 2 bearings swivel , making it survive stronger wind and run more safely
    5.Patented permanent magnet ac generator with special stator,effectively reduce torque,well match the wind wheel and generator, and ensure the performance of whole system.
    6.Controller,inverter can be matched accroding to customers’ specific needs

    Package list:
    1.wind turbine 1 set(hub,tail,3/5 blades,generator,hood,bolts and nuts).
    2.wind controller 1 piece.
    3. installation tool 1 set.
    4.flange 1 piece.

    Specifications

    Model S2-200 S2-300
    Rated Power(w) 200w 300w
    Max Power(w) 220w 320w
    Rated Voltage(v) 12/24V 12/24V
    Blades length(mm) 530/580 530/580
    Top net weight(kg) 6 6.2
    Wind wheel diameter(m) 1.1 1.1
    Blades number 3/5 3/5
    Start-up wind speed 1.3m/s
    Survival wind speed 40m/s
    generator 3 phase permanent magnet synchronous generator
    Service Life More Than 20 years
    Bearing HRB or for your order
    Blades material nylon
    Shell Material nylon
    Permanent Magnet Material Rare Earth NdFeB
    Control system Electromagnet
    Lubrication Lubrication Grease
    Working temperature -40 to 80

    Assembly Requirements

    1. Before the assembly of the wind generator or in the process of maintenance, please be sure to read the users manual first..

    2. Please don’t install the wind turbines in rainy days or when the wind scale is at Level 3 or above.

    3. After opening the package, it is advised to short circuit the three leads of the wind turbines the exposed copper parts should be screwed together).

    4. Before the installation of the wind turbine, lightning grounding must be prepared. You can arrange the facilities according to national standards, or you may arrange them according to the local environment and soil condition.

    5.When assembling the Wind turbine, All the parts should be fastened with fasteners specified in table1.

    5.When assembling the Wind turbine, All the parts should be fastened with fasteners specified in table2

    6. Before the connection between the wind turbine flange and the tower flange, please connect the three leads of the wind turbine to the three leads of the tower accordingly. When using the hinge method, every pair of wires should be no less than 30mm in length and be wrapped with Acetate cloth tape for three layers, then sheathed with spun glass paint tube. With this method, connect the three pairs of wires (attention: the joint of the wires can’t bear the weight of the tower leads directly, so wires 100mm downward from the joint should be wrapped with adhesive tape and then stuffed into the steel pipe. After that, wind turbine flange and tower flange can be connected.

    7.Before hoisting the wind turbines, the end (which should be connected with controller)of the tower lead should be cut away the insulating layer for 10mm or so. Then screw the three exposed leads (shot circuit) together.

    8. During the installation, it is prohibited to revolve the rotor blades roughly (the ends of wind turbine leads or the tower leads are short-circuited at this moment). Only after all the installation and the examination is finished and the security of the erection crew is guaranteed, it is allowed to dismantle short circuited leads and then connect with controller and battery before  running.


  • Previous:
  • Next:

  •